Building Your First Implosion Score: A Beginner's Guide
First-time implosion coordinators frequently spend three to six weeks on their initial blast plan before discovering the structural drawings they annotated don't account for the post-tensioned slabs on floors 8 through 14. Building a correct implosion score the first time requires a defined workflow, not just a template. This guide walks through the complete planning pipeline — from structural survey to delay notation — using the visual score format that turns a 200-column blast plan into a readable demolition composition.